Project Details

  • Project Cost: $10.2 million
  • Design Awarded: May 2009
  • Contract Awarded: January 2010
  • Construction Completed: January 2012

  • Scope of Services

    Clean Agent Fire Suppression System
    • Emergency Generator
    • Fire Alarm System
    • Dedicated Electrical Service
    • DX Cooling Split System
    CCTV Surveillance
    • Card Access Control


    Client Reference

    Mr. Jerry Thompson
    School District of Philadelphia
    440 N. Broad St., 3rd Floor
    Philadelphia, PA
    Tel: 215-400-5191


Relocation of and Upgrades to Twenty Core-Sites & One Data Center

The School District of Philadelphia’s Office of Technology Services (SDP OTS) currently supports and maintains twenty existing Information / Instruction Technology Wide Area Network (IT-WAN) Core-Sites, which are central nodes in the overall “data distribution network via optical fiber cabling” scheme.

The scope of work consisted of relocating the existing Core-Sites to a grade-level installation readily accessible from the building exterior only, and not accessible from within the school buildings. Princeton Engineering Services and its sub-consultants provided the design for Electrical, HVAC, Plumbing, Fire Protection and Architectural upgrades to the Core-Site installations. Said upgrades were as necessary to ensure that the core-site installations were improved to be commensurate with the “Mission Critical Facility” function that they are required to serve.


I.T. Infrastructure, Fire Alarm Systems, CCTV Surveillance