PES Project Profile

New Jersey Network (NJN) Building

Trenton, New Jersey

Project Details

  • Project Cost: $800,000
  • Design Awarded: October 2015
  • Design Completed: September 2016
  • Project Completed: Ongoing

  • Relevant Scope of Work

    • Electric System
    HVAC Systems
    • Telecommunications


    Key Services Provided

    • Lighting Retrofit
    • Conference Rooms Fitout – Lighting and HVAC
    • Telecom and Power Wiring
    • Exterior Light Replacement
    • HVAC Calculations
    • Energy Saving
    • Design Development
    • Construction Site Administrative Services


    Client Reference

    Mr. Regan Young, AIA
    RYEBREAD Architects
    456 High Street
    Mount Holly, NJ 08060
    Tel: 609-265-2652


Telecommunications, Lighting & Office Upgrade and additional MPE Engineering and Design in Studios

PES provided fire protection, HVAC, Electrical and 5th floor design changes. Fire protection services involved evaluation and modification of existing sprinkler distribution limited to Studio A & D as required. HVAC Services provided evaluation of existing HVAC ductwork distribution in areas within scope of work and re-design to satisfy code required ventilation requirements.

Electrical design included further investigation of existing lighting system and replacement/relocation/re-circuiting to satisfy space needs. The 5th floor design included setting up of additional 2 printer stations, modifications to 5 offices and 13 working stations. It also provided lighting, receptacles, ductwork and sprinkler layout to accommodate the changes.


Telecommunications, Lighting & Office Upgrade